IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,633

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0158 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $1,163 $448 Not Implemented
TN0136 # 01 Y:1982 01 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,680 $0 Not Implemented
TN0136 # 02 Y:1982 02 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $284 $160 Not Implemented
TN0136 # 03 Y:1982 03 1982 REDUCE GLAZED AREAS IN BUILDINGS $315 $1,000 Not Implemented
OK0060 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $406 $294 Not Implemented
OK0060 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $436 $600 Implemented
OK0060 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $293 $0 Not Implemented
OK0060 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,428 $18,000 Not Implemented
OK0060 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $3,052 $5,840 Not Implemented
OK0060 # 06 Y:1982 06 1982 INSULATE BARE EQUIPMENT $497 $202 Not Implemented
OK0060 # 07 Y:1982 07 1982 INSULATE BARE EQUIPMENT $438 $254 Not Implemented
OK0060 # 08 Y:1982 08 1982 INSULATE BARE EQUIPMENT $4,281 $2,495 Not Implemented
UD0044 # 01 Y:1982 01 1982 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,962 $2,000 Not Implemented
OK0036 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,397 $600 Implemented
OK0036 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,757 $140 Implemented
OK0036 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,447 $8,375 Implemented
OK0036 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,547 $675 Implemented
OK0033 # 01 Y:1982 01 1982 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,801 $6,550 Not Implemented
OK0033 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $458 $99 Not Implemented
OK0033 # 03 Y:1982 03 1982 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $348 $432 Not Implemented
OK0033 # 04 Y:1982 04 1982 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $228 $140 Not Implemented
KU0038 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $2,427 Not Implemented
KU0038 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $810 $335 Not Implemented
KU0038 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Not Implemented
KU0038 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $300 $400 Not Implemented