IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 3221 Glass Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0234 # 04 Y:2000 04 2000 IMPROVE SPACE COMFORT CONDITIONING $500 $500 n/a
HO0234 # 05 Y:2000 05 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,360 $300 n/a
HO0234 # 06 Y:2000 06 2000 IMPROVE SPACE COMFORT CONDITIONING $2,960 $0 n/a
NC0186 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,878 $20 Not Implemented
NC0186 # 02 Y:2000 02 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,993 $6,400 Not Implemented
NC0186 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $9,327 $32,175 Not Implemented
NC0186 # 04 Y:2000 04 2000 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,321 $4,000 Implemented
NC0186 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,150 $200 Not Implemented
UD0446 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $46,224 $42,000 Implemented
UD0446 # 02 Y:1994 02 1994 REDUCE VENTILATION AIR $5,261 $4,000 Implemented
UD0446 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $56,909 $35,000 Not Implemented
UD0446 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,027 $2,280 Implemented
WV0027 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,819 $2,800 Not Implemented
WV0027 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,430 $0 Implemented
WV0027 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $1,171 Implemented
WV0027 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $740 $17,110 Implemented
WV0027 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $6,765 $0 Not Implemented
GT0516 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,280 $0 Not Implemented
GT0516 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,340 $72,000 Not Implemented
GT0516 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $72,000 $40,000 Not Implemented
GT0516 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $39,000 $0 Not Implemented
AM0166 # 01 Y:1993 01 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $180,480 $174,160 Not Implemented
AM0166 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $59,900 $29,000 Implemented
AM0166 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,650 $7,630 Not Implemented
AM0166 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,500 $500 Implemented