Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 3272 | Concrete Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0004 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,246 | $90,267 | Implemented |
SJ0004 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $3,878 | Implemented |
SJ0004 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $163 | $0 | Not Implemented |
SJ0004 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $238 | Implemented |
SJ0004 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $96 | $171 | Not Implemented |
SF0544 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $920 | $0 | Implemented |
SF0544 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,820 | $9,188 | Implemented |
SF0544 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $249,622 | $1,187,556 | Implemented |
SF0544 # 02 Y:2019 | 02 | 2019 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $1,610 | $2,208 | Implemented |
SF0544 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,026 | $11,278 | Not Implemented |
LM0061 # 11 Y:2003 | 11 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $360,180 | $35,000 | Implemented |
LM0061 # 12 Y:2003 | 12 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $200,000 | $7,500 | Not Implemented |
LM0061 # 13 Y:2003 | 13 | 2003 | MODIFY CURRENT INCENTIVE PROGRAM | $34,000 | $5,000 | Implemented |
LM0061 # 10 Y:2003 | 10 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $42,240 | $25,000 | Not Implemented |
LM0061 # 09 Y:2003 | 09 | 2003 | MODIFY STARTUP/SHUTDOWN TIMES | $11,678 | $25,000 | Not Implemented |
LM0061 # 08 Y:2003 | 08 | 2003 | MAKE A NEW BY-PRODUCT | $20,000 | $300 | Not Implemented |
LM0061 # 07 Y:2003 | 07 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $530 | $0 | Not Implemented |
LM0061 # 06 Y:2003 | 06 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,290 | $1,000 | Implemented |
LM0061 # 05 Y:2003 | 05 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,642 | $0 | Not Implemented |
LM0061 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $320 | $288 | Not Implemented |
LM0061 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,049 | $1,281 | Implemented |
LM0061 # 02 Y:2003 | 02 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $78,994 | $149,000 | Not Implemented |
LM0061 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $430 | Implemented |
NV0135 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $813 | $332 | Implemented |
NV0135 # 04 Y:1999 | 04 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,746 | $9,000 | Not Implemented |