IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0004 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,246 $90,267 Implemented
SJ0004 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,878 Implemented
SJ0004 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $163 $0 Not Implemented
SJ0004 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $238 Implemented
SJ0004 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $171 Not Implemented
SF0544 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
SF0544 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $249,622 $1,187,556 Implemented
SF0544 # 02 Y:2019 02 2019 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $1,610 $2,208 Implemented
SF0544 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,026 $11,278 Not Implemented
LM0061 # 11 Y:2003 11 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $360,180 $35,000 Implemented
LM0061 # 12 Y:2003 12 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $200,000 $7,500 Not Implemented
LM0061 # 13 Y:2003 13 2003 MODIFY CURRENT INCENTIVE PROGRAM $34,000 $5,000 Implemented
LM0061 # 10 Y:2003 10 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $42,240 $25,000 Not Implemented
LM0061 # 09 Y:2003 09 2003 MODIFY STARTUP/SHUTDOWN TIMES $11,678 $25,000 Not Implemented
LM0061 # 08 Y:2003 08 2003 MAKE A NEW BY-PRODUCT $20,000 $300 Not Implemented
LM0061 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $530 $0 Not Implemented
LM0061 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,290 $1,000 Implemented
LM0061 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,642 $0 Not Implemented
LM0061 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $288 Not Implemented
LM0061 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,049 $1,281 Implemented
LM0061 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $78,994 $149,000 Not Implemented
LM0061 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $430 Implemented
NV0135 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $813 $332 Implemented
NV0135 # 04 Y:1999 04 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,746 $9,000 Not Implemented