IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
MA0620 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,323 $6,022 Implemented
MA0620 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,751 $3,025 Implemented
MA0620 # 06 Y:2007 06 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,532 $8,100 Implemented
MA0620 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $9,514 $1,776 Implemented
MA0620 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,535 $24,820 Implemented
MA0620 # 02 Y:2007 02 2007 HEAT WATER WITH EXHAUST HEAT $25,021 $44,540 Implemented
MA0553 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $910 $550 Implemented
MA0553 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,228 $600 Implemented
MA0553 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,977 $12,543 Implemented
MA0553 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,555 $15,605 Implemented
MA0348 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $4,750 Implemented
MA0348 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,014 $1,200 Implemented
MA0348 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $127 Implemented
MA0232 # 05 Y:1992 05 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $884 $150 Implemented
MA0232 # 04 Y:1992 04 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,067 $0 Implemented
MA0232 # 03 Y:1992 03 1992 REPAIR OR REPLACE STEAM TRAPS $2,293 $2 Implemented
MA0225 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $551 $0 Implemented
MA0225 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $970 $970 Implemented
MA0225 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $1,367 $660 Implemented
MA0154 # 02 Y:1989 02 1989 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $882 $2,892 Implemented
MA0154 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,565 $12,000 Implemented
MA0122 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,916 $10,000 Implemented
MA0122 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,883 $3,400 Implemented