Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0428 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,921 | $511 | Implemented |
IA0428 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,880 | $452 | Implemented |
IA0428 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,045 | $1,297 | Implemented |
IA0428 # 05 Y:2008 | 05 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,344 | $220 | Implemented |
IA0428 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,017 | $262 | Implemented |
IA0428 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,152 | $1,759 | Implemented |
IA0428 # 08 Y:2008 | 08 | 2008 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $23,965 | $2,500 | Not Implemented |
IA0428 # 10 Y:2008 | 10 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,521 | $10,000 | Implemented |
IA0428 # 07 Y:2008 | 07 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $194 | $3,086 | Not Implemented |
IA0428 # 09 Y:2008 | 09 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,149 | $10,000 | Not Implemented |
IA0282 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,739 | $290 | Not Implemented |
IA0282 # 09 Y:2001 | 09 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $45,760 | $58,400 | n/a |
IA0282 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $836 | $25 | Not Implemented |
IA0282 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,095 | $3,205 | Implemented |
IA0282 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,847 | $0 | Implemented |
IA0282 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,255 | $0 | Implemented |
IA0282 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,297 | $1,111 | Not Implemented |
IA0282 # 08 Y:2001 | 08 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $6,750 | $9,596 | Implemented |
IA0282 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $489 | $174 | Implemented |
DS0048 # 09 Y:1996 | 09 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $34,241 | $40,760 | Not Implemented |
DS0048 # 08 Y:1996 | 08 | 1996 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $26,694 | $160 | Not Implemented |
DS0048 # 07 Y:1996 | 07 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,733 | $6,500 | Implemented |
DS0048 # 06 Y:1996 | 06 | 1996 | INSULATE BARE EQUIPMENT | $4,640 | $3,678 | Implemented |
DS0048 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,128 | $250 | Implemented |
DS0048 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,971 | $750 | Not Implemented |