IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0428 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,921 $511 Implemented
IA0428 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $452 Implemented
IA0428 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,045 $1,297 Implemented
IA0428 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,344 $220 Implemented
IA0428 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,017 $262 Implemented
IA0428 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,152 $1,759 Implemented
IA0428 # 08 Y:2008 08 2008 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $23,965 $2,500 Not Implemented
IA0428 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,521 $10,000 Implemented
IA0428 # 07 Y:2008 07 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $194 $3,086 Not Implemented
IA0428 # 09 Y:2008 09 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,149 $10,000 Not Implemented
IA0282 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,739 $290 Not Implemented
IA0282 # 09 Y:2001 09 2001 $45,760 $58,400 n/a
IA0282 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $836 $25 Not Implemented
IA0282 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,095 $3,205 Implemented
IA0282 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,847 $0 Implemented
IA0282 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,255 $0 Implemented
IA0282 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,297 $1,111 Not Implemented
IA0282 # 08 Y:2001 08 2001 USE RADIANT HEATER FOR SPOT HEATING $6,750 $9,596 Implemented
IA0282 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $174 Implemented
DS0048 # 09 Y:1996 09 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $34,241 $40,760 Not Implemented
DS0048 # 08 Y:1996 08 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $26,694 $160 Not Implemented
DS0048 # 07 Y:1996 07 1996 RECOVER WASTE HEAT FROM EQUIPMENT $5,733 $6,500 Implemented
DS0048 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $4,640 $3,678 Implemented
DS0048 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,128 $250 Implemented
DS0048 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,971 $750 Not Implemented