Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 3321 | Gray And Ductile Iron Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0432 # 12 Y:2008 | 12 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,480 | $5,333 | Implemented |
IA0432 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $330 | Implemented |
IA0432 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,099 | $1,884 | Implemented |
IA0432 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,859 | $620 | Implemented |
IA0432 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $986 | $67 | Not Implemented |
IA0432 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $979 | $17 | Implemented |
IA0432 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $322 | Implemented |
IA0432 # 08 Y:2008 | 08 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,295 | $3,442 | Not Implemented |
IA0432 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $571 | $1,650 | Implemented |
IA0432 # 10 Y:2008 | 10 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,529 | $1,781 | Not Implemented |
IA0432 # 11 Y:2008 | 11 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,042 | $930 | Not Implemented |
IA0432 # 07 Y:2008 | 07 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $423 | $143 | Implemented |
IA0331 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $614 | $586 | Implemented |
IA0331 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $1,738 | Implemented |
IA0331 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $203 | $599 | Implemented |
IA0331 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,450 | $1,754 | Implemented |
IA0331 # 09 Y:2003 | 09 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,789 | $29,757 | Not Implemented |
IA0331 # 10 Y:2003 | 10 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,977 | $10,800 | Not Implemented |
IA0331 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $1,491 | $3,352 | Not Implemented |
IA0331 # 12 Y:2003 | 12 | 2003 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $200,000 | $200,000 | Not Implemented |
IA0331 # 13 Y:2003 | 13 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $18,530 | $12,000 | Not Implemented |
IA0331 # 14 Y:2003 | 14 | 2003 | COVER OPEN TANKS | $1,451 | $4,500 | Not Implemented |
IA0331 # 15 Y:2003 | 15 | 2003 | AUTOMATE PAYROLL SYSTEM | $9,200 | $12,500 | Implemented |
IA0331 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,662 | $3,125 | Implemented |
IA0331 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,790 | $5,790 | Not Implemented |