IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1912 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,767 $150 Not Implemented
LS1912 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,696 $50 Not Implemented
LS1912 # 04 Y:2019 04 2019 INSTALL AUTOMATIC PACKING EQUIPMENT $1,164,856 $900,000 Not Implemented
LS1912 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,657 $2,850 Not Implemented
LS1912 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,700 $46,200 Not Implemented
LS1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,179 $630 Not Implemented
LS1912 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $1,198 Not Implemented
AM0622 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $550 $0 Not Implemented
AM0622 # 01 Y:2012 01 2012 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $80,000 $240,000 Not Implemented
AM0622 # 09 Y:2012 09 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
AM0622 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,300 $0 Not Implemented
AM0622 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $870 Implemented
AM0622 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,900 $500 Not Implemented
AM0622 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,770 $55 Not Implemented
AM0622 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,720 $520 Implemented
AM0622 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,450 $69,300 Implemented
AM0622 # 02 Y:2012 02 2012 MINIMIZE WATER USAGE $42,000 $7,000 Not Implemented
LL0337 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $88,374 $59,360 Implemented
LL0337 # 02 Y:2010 02 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,781 $4,070 Not Implemented
LL0337 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,266 $1,800 Not Implemented
LL0337 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,153 $10,605 Not Implemented
LL0337 # 05 Y:2010 05 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,875 $1,650 Implemented
LL0337 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $700 Not Implemented
LL0337 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $235 $319 Not Implemented
LL0337 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,079 $695 Not Implemented