IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
UM0402 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,600 $2,000 Not Implemented
UM0402 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,676 $4,000 Not Implemented
UM0402 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,391 $4,000 Not Implemented
UM0402 # 07 Y:2012 07 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $52,867 $2,000 Not Implemented
UM0402 # 08 Y:2012 08 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,060 $15,000 Not Implemented
UMS004 # 04 Y:2012 04 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $27,600 $75,000 Not Implemented
UMS004 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $200,000 $200,000 Not Implemented
UMS004 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,000 $40,000 Not Implemented
UMS004 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $0 Not Implemented
UMS004 # 07 Y:2012 07 2012 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,300 $0 Not Implemented
UMS004 # 03 Y:2012 03 2012 COVER OPEN TANKS $41,000 $32,000 Not Implemented
UMS004 # 02 Y:2012 02 2012 CONVERT TO OXYFUEL BURNERS $156,000 $250,000 Not Implemented
UM0193 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,099 $12,877 Not Implemented
UM0193 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,550 $3,000 Implemented
UM0193 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $675 Implemented
UM0193 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,365 $1,000 Implemented
UM0193 # 10 Y:2001 10 2001 REDESIGN PROCESS $40,150 $2,500 Implemented
UM0193 # 05 Y:2001 05 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $487 $1,000 Not Implemented
UM0193 # 06 Y:2001 06 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $341 $200 Implemented
UM0193 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,160 $2,060 Not Implemented
UM0193 # 13 Y:2001 13 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,000 $4,200 Not Implemented
UM0193 # 12 Y:2001 12 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,010 $1,650 Not Implemented