Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 3363 | Aluminum Die-castings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0402 # 01 Y:2012 | 01 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,681 | $200 | Implemented |
UM0402 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,300 | $200 | Implemented |
UM0402 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,496 | $2,000 | Implemented |
UM0402 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,600 | $2,000 | Not Implemented |
UM0402 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,676 | $4,000 | Not Implemented |
UM0402 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,391 | $4,000 | Not Implemented |
UM0402 # 07 Y:2012 | 07 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $52,867 | $2,000 | Not Implemented |
UM0402 # 08 Y:2012 | 08 | 2012 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $11,060 | $15,000 | Not Implemented |
UMS004 # 04 Y:2012 | 04 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $27,600 | $75,000 | Not Implemented |
UMS004 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $200,000 | $200,000 | Not Implemented |
UMS004 # 06 Y:2012 | 06 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $40,000 | $40,000 | Not Implemented |
UMS004 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,500 | $0 | Not Implemented |
UMS004 # 07 Y:2012 | 07 | 2012 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $1,300 | $0 | Not Implemented |
UMS004 # 03 Y:2012 | 03 | 2012 | COVER OPEN TANKS | $41,000 | $32,000 | Not Implemented |
UMS004 # 02 Y:2012 | 02 | 2012 | CONVERT TO OXYFUEL BURNERS | $156,000 | $250,000 | Not Implemented |
UM0193 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,099 | $12,877 | Not Implemented |
UM0193 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,550 | $3,000 | Implemented |
UM0193 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $675 | Implemented |
UM0193 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,365 | $1,000 | Implemented |
UM0193 # 10 Y:2001 | 10 | 2001 | REDESIGN PROCESS | $40,150 | $2,500 | Implemented |
UM0193 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $487 | $1,000 | Not Implemented |
UM0193 # 06 Y:2001 | 06 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $341 | $200 | Implemented |
UM0193 # 08 Y:2001 | 08 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,160 | $2,060 | Not Implemented |
UM0193 # 13 Y:2001 | 13 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,000 | $4,200 | Not Implemented |
UM0193 # 12 Y:2001 | 12 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $26,010 | $1,650 | Not Implemented |