IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

566

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0225 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,768 $95 Not Implemented
TN0225 # 03 Y:1984 03 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,670 $0 Not Implemented
TN0225 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,236 $500 Not Implemented
TN0225 # 05 Y:1984 05 1984 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $18,012 $10,000 Not Implemented
TN0225 # 06 Y:1984 06 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
TN0225 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,159 $3,500 Not Implemented
TN0215 # 01 Y:1984 01 1984 COVER OPEN TANKS $10,482 $3,500 Implemented
TN0215 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $12,107 $1,000 Implemented
TN0215 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,092 $300 Implemented
TN0215 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,311 $175 Implemented
TN0215 # 05 Y:1984 05 1984 REDUCE FLUID FLOW RATES $5,029 $1,680 Not Implemented
TN0215 # 06 Y:1984 06 1984 INSTALL SET-BACK TIMERS $3,077 $0 Implemented
TN0215 # 07 Y:1984 07 1984 USE MINIMUM STEAM OPERATING PRESSURE $427 $0 Implemented
TN0181 # 01 Y:1983 01 1983 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,272 $11,460 Not Implemented
TN0181 # 02 Y:1983 02 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,841 $10,000 Not Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
TN0193 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,146 $800 Not Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
TN0175 # 01 Y:1983 01 1983 USE RADIANT HEATER FOR SPOT HEATING $11,000 $53,000 Not Implemented
TN0175 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,977 $4,000 Not Implemented
TN0175 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $520 $0 Not Implemented
TN0163 # 01 Y:1982 01 1982 COVER OPEN TANKS $5,700 $1,250 Not Implemented
TN0163 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $140 $100 Not Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented