IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0070 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $735 Implemented
AR0015 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,666 $740 Not Implemented
AR0015 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,046 $6,750 Not Implemented
AR0015 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,562 $1,000 Implemented
AR0015 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,187 $14,712 Not Implemented
AR0015 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,409 $5,000 Not Implemented
AR0015 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,253 $12,000 Not Implemented
GT0514 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,380 $14,150 Implemented
GT0514 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $7,520 Implemented
GT0514 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $900 Implemented
GT0514 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,600 $10,000 Not Implemented
GT0514 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $16,240 $25,000 Implemented
GT0514 # 06 Y:1993 06 1993 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,150 $40,000 Not Implemented
GT0514 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,860 $17,100 Not Implemented
CO0290 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,960 $6,140 Implemented
CO0290 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,920 $16,060 Implemented
CO0290 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,750 $30,180 Implemented
CO0290 # 04 Y:1993 04 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,580 $5,000 Implemented
CO0290 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,350 $2,500 Not Implemented
CO0290 # 06 Y:1993 06 1993 INSTALL TIMERS AND/OR THERMOSTATS $900 $150 Implemented
OK0417 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,331 $180 Implemented
OK0417 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,551 $0 Not Implemented
OK0417 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,614 $5,045 Implemented
OK0417 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $1,428 $1,200 Implemented
OK0417 # 05 Y:1993 05 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $922 $790 Implemented