IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0341 # 05 Y:1991 05 1991 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,435 $800 Not Implemented
KU0341 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,048 $570 Not Implemented
KU0341 # 07 Y:1991 07 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,561 $1,975 Not Implemented
KU0341 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $800 Not Implemented
MA0213 # 01 Y:1991 01 1991 AIR CONDITION ONLY SPACE NECESSARY $2,708 $7,000 Not Implemented
MA0213 # 02 Y:1991 02 1991 REPAIR OR REPLACE STEAM TRAPS $2,582 $0 Not Implemented
MA0213 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $246 $212 Not Implemented
MA0213 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $911 $485 Not Implemented
MA0213 # 05 Y:1991 05 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $11,500 $0 Not Implemented
MA0213 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,024 $241 Not Implemented
MA0213 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,097 $0 Not Implemented
MA0213 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $0 Not Implemented
RU0114 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $0 Implemented
RU0114 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $214 Implemented
RU0114 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,104 $2,150 Implemented
RU0114 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $700 Implemented
RU0114 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $2,850 $800 Implemented
RU0114 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,509 $500 Implemented
RU0114 # 07 Y:1991 07 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $52,380 $15,000 Implemented
RU0114 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,442 $9,609 Implemented
UD0342 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $9,819 $0 Not Implemented
UD0342 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,238 $0 Not Implemented
UD0342 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,746 $0 Not Implemented
UD0342 # 04 Y:1991 04 1991 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,611 $2,000 Not Implemented
UD0342 # 05 Y:1991 05 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,474 $11,865 Not Implemented