Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0068 # 07 Y:1986 | 07 | 1986 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $112,028 | $82,000 | Implemented |
ST0062 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,343 | $537 | Implemented |
ST0062 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,642 | $0 | Implemented |
ST0062 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,555 | $0 | Not Implemented |
ST0062 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $716 | $0 | Not Implemented |
ST0062 # 05 Y:1986 | 05 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $559 | $50 | Not Implemented |
ST0062 # 06 Y:1986 | 06 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $2,605 | $1,500 | Implemented |
ST0062 # 07 Y:1986 | 07 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,765 | $651 | Implemented |
KU0201 # 01 Y:1986 | 01 | 1986 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,771 | $5,500 | Not Implemented |
KU0201 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,677 | $1,581 | Implemented |
KU0201 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,483 | $120 | Implemented |
KU0201 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,460 | $2,135 | Implemented |
KU0201 # 05 Y:1986 | 05 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,243 | $90 | Implemented |
KU0201 # 06 Y:1986 | 06 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,118 | $2,100 | Not Implemented |
KU0201 # 07 Y:1986 | 07 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $740 | $10 | Implemented |
KU0201 # 08 Y:1986 | 08 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $173 | $1,500 | Not Implemented |
KU0201 # 09 Y:1986 | 09 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $590 | $0 | Implemented |
KU0201 # 10 Y:1986 | 10 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $480 | $50 | Not Implemented |
KU0201 # 11 Y:1986 | 11 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $155 | $0 | Implemented |
KU0201 # 12 Y:1986 | 12 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $200 | Implemented |
KU0201 # 13 Y:1986 | 13 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
MA0067 # 01 Y:1986 | 01 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $262 | $0 | Implemented |
MA0067 # 02 Y:1986 | 02 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $125 | $150 | Not Implemented |
MA0067 # 03 Y:1986 | 03 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $484 | $900 | Implemented |
MA0067 # 04 Y:1986 | 04 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,076 | $7,000 | Not Implemented |