Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
588
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0324 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,732 | $35,000 | n/a |
TT0324 # 09 Y:2025 | 09 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,799 | $60 | n/a |
TT0324 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,316 | $1,305 | n/a |
TT0324 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,929 | $13,000 | n/a |
TT0324 # 01 Y:2025 | 01 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $160,334 | $75,000 | n/a |
TT0324 # 02 Y:2025 | 02 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $83,556 | $0 | n/a |
TT0324 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,846 | $500 | n/a |
TT0324 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $29,835 | $24,750 | n/a |
TT0324 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,944 | $82,992 | n/a |
TT0321 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,097 | $10,000 | n/a |
TT0321 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,594 | $2,250 | n/a |
TT0321 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $0 | n/a |
TT0321 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,797 | $3,000 | n/a |
TT0321 # 13 Y:2025 | 13 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $584 | $1,125 | n/a |
TT0321 # 12 Y:2025 | 12 | 2025 | MINIMIZE WATER USAGE | $830 | $0 | n/a |
TT0321 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $71,296 | $345,600 | n/a |
TT0321 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,173 | $0 | n/a |
TT0321 # 07 Y:2025 | 07 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,896 | $1,450 | n/a |
TT0321 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,906 | $3,825 | n/a |
TT0321 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $28,035 | $28,125 | n/a |
TT0321 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,473 | $10,000 | n/a |
TT0321 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $645 | n/a |
TT0306 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,347 | $2,600 | n/a |
TT0306 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,321 | $1,560 | n/a |
TT0306 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $917 | $113 | n/a |