Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 3411 | Metal Cans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0354 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,143 | $43,000 | Not Implemented |
TA0089 # 05 Y:2004 | 05 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,740 | $0 | Implemented |
TA0089 # 04 Y:2004 | 04 | 2004 | USE MINIMUM SAFE OVEN VENTILATION | $1,890 | $1,500 | Implemented |
TA0089 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $10,000 | $3,200 | Implemented |
TA0089 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45,060 | $540 | Implemented |
TA0089 # 01 Y:2004 | 01 | 2004 | MOVE BOILER TO MORE EFFICIENT LOCATION | $87,420 | $4,860 | Implemented |
SD0354 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,079 | $398 | Implemented |
SD0354 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,367 | $18,600 | Implemented |
SD0354 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,424 | $320 | Implemented |
SD0354 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,786 | $68,250 | Not Implemented |
LE0184 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,446 | $0 | Not Implemented |
LE0184 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,017 | $30,709 | Implemented |
LE0184 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,355 | $1,500 | Implemented |
LE0184 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,137 | $200 | Implemented |
LE0184 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,237 | $0 | Implemented |
LE0184 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $15,203 | $2,000 | Not Implemented |
LE0184 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $34,434 | $10,000 | Implemented |