IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

549

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0017 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $114 Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented
OK0122 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,414 $290 Implemented
OK0122 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,584 $2,024 Implemented
OK0122 # 07 Y:1984 07 1984 REDUCE VENTILATION AIR $316 $40 Implemented
OK0122 # 08 Y:1984 08 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $435 $693 Implemented
OK0122 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,840 $9,307 Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
KU0093 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $5,773 $3,300 Implemented
KU0093 # 06 Y:1983 06 1983 INSTALL AUTOMATIC STACK DAMPER $442 $300 Implemented
KU0093 # 07 Y:1983 07 1983 INSTALL AUTOMATIC STACK DAMPER $3,591 $4,600 Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
UD0058 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,729 $2,704 Implemented
UD0058 # 04 Y:1982 04 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,600 $4,500 Implemented
UD0060 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,603 $4,366 Implemented
UD0060 # 02 Y:1982 02 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,089 $1,000 Implemented
UD0060 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,230 $46,000 Implemented
UD0060 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $0 Implemented
TN0118 # 01 Y:1982 01 1982 COVER OPEN TANKS $1,586 $120 Implemented
TN0118 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $309 $630 Implemented
TN0118 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,880 $400 Implemented