IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0733 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,768 $10,000 Implemented
MA0733 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,616 $71,100 Implemented
MA0733 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $1,800 Implemented
MA0253 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $9,608 $15,134 Implemented
MA0253 # 02 Y:1992 02 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,977 $5,000 Implemented
MA0253 # 03 Y:1992 03 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,697 $2,524 Implemented
MA0253 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,078 $2,000 Implemented
MA0253 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $3,216 $2 Implemented
MA0150 # 02 Y:1989 02 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,258 $3,032 Implemented
MA0150 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,394 $2,099 Implemented
MA0134 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,972 $918 Implemented
MA0132 # 04 Y:1988 04 1988 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $29,091 $9,930 Implemented
MA0132 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $834 $340 Implemented
MA0134 # 04 Y:1988 04 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,494 $1,085 Implemented
MA0134 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $1,340 Implemented
MA0123 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $139 Implemented
MA0123 # 02 Y:1988 02 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,548 $21,500 Implemented
MA0123 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,090 $0 Implemented
MA0123 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,768 $229 Implemented