IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0043 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $338 $0 Implemented
LT0043 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $901 $300 Implemented
LT0043 # 03 Y:1985 03 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,159 $200 Implemented
LT0043 # 04 Y:1985 04 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,294 $412 Implemented
LT0043 # 05 Y:1985 05 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,977 $0 Not Implemented
LT0043 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $402 $1,020 Not Implemented
LT0043 # 07 Y:1985 07 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $662 $0 Implemented
CO0042 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $69 $100 Not Implemented
CO0042 # 09 Y:1985 09 1985 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,421 $5,500 Not Implemented
CO0042 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $283 $200 Implemented
CO0042 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,923 $600 Not Implemented
CO0042 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $91 $100 Not Implemented
CO0042 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $6,858 $450 Not Implemented
CO0042 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,853 $645 Implemented
CO0042 # 14 Y:1985 14 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $1,459 Implemented
CO0042 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,926 $200 Implemented
CO0042 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $18,823 $500 Implemented
CO0042 # 13 Y:1985 13 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,837 $5,000 Not Implemented
CO0042 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,256 $2,000 Not Implemented
CO0042 # 10 Y:1985 10 1985 COVER OPEN TANKS $1,052 $234 Not Implemented
CO0042 # 12 Y:1985 12 1985 INSTALL STORM WINDOWS AND DOORS $7,925 $4,000 Not Implemented
AT0005 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $490 $1,183 Implemented
AT0005 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,384 $226 Implemented
AT0005 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $346 $0 Not Implemented
AT0005 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $24,347 $1,200 Implemented