IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0097 # 02 Y:1987 02 1987 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,263 $12,000 Not Implemented
MA0097 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $922 $876 Not Implemented
MA0097 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $1,086 $851 Not Implemented
MA0097 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,363 $5,500 Not Implemented
MA0097 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $349 $2,167 Not Implemented
MA0097 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,283 $0 Not Implemented
MA0097 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,545 $6,000 Not Implemented
MA0097 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $108 $86 Not Implemented
TN0313 # 08 Y:1987 08 1987 INSULATE BARE EQUIPMENT $588 $470 Implemented
TN0313 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,722 $300 Implemented
TN0313 # 06 Y:1987 06 1987 COVER OPEN TANKS $3,024 $1,651 Implemented
TN0313 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,202 $225 Implemented
TN0313 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,696 $972 Implemented
TN0313 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,250 $0 Implemented
TN0313 # 02 Y:1987 02 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,160 $10,750 Not Implemented
TN0313 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $13,202 $8,130 Implemented
WI0005 # 06 Y:1987 06 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44 $0 Implemented
WI0005 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,319 $2,700 Not Implemented
WI0005 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $620 Implemented
WI0005 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $110 Implemented
WI0005 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,114 $0 Implemented
WI0005 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $5,838 $0 Implemented