IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0083 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $2,368 Implemented
RU0083 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $3,851 $6,100 Implemented
RU0083 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,662 $0 Implemented
MA0123 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $139 Implemented
MA0123 # 02 Y:1988 02 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,548 $21,500 Implemented
MA0123 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,090 $0 Implemented
MA0123 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,768 $229 Implemented
OK0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $213 Implemented
OK0257 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $409 $0 Implemented
OK0257 # 03 Y:1988 03 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $682 $0 Implemented
RU0019 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,019 $209 Implemented
RU0019 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,164 $0 Implemented
RU0019 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,736 $302 Implemented
RU0019 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $764 $800 Implemented
RU0019 # 06 Y:1988 06 1988 COVER OPEN TANKS $2,983 $200 Implemented
RU0019 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,725 $0 Implemented
TN0313 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $13,202 $8,130 Implemented
TN0313 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,250 $0 Implemented
TN0313 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,696 $972 Implemented
TN0313 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,202 $225 Implemented
TN0313 # 06 Y:1987 06 1987 COVER OPEN TANKS $3,024 $1,651 Implemented
TN0313 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,722 $300 Implemented
TN0313 # 08 Y:1987 08 1987 INSULATE BARE EQUIPMENT $588 $470 Implemented
ST0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,959 $140 Implemented
ST0053 # 08 Y:1986 08 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,913 $0 Implemented