IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

586

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0358 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $675 $0 Implemented
UD0358 # 03 Y:1991 03 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,145 $200 Implemented
UD0358 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $0 Implemented
UD0358 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,636 $0 Implemented
UD0358 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $0 Implemented
AS0030 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $432 $63 Not Implemented
AS0030 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $500 Not Implemented
AS0030 # 03 Y:1991 03 1991 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,235 $2,000 Not Implemented
AS0030 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29 $72 Not Implemented
AS0030 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $349 $0 Not Implemented
UD0342 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $9,819 $0 Not Implemented
UD0342 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,238 $0 Not Implemented
UD0342 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,746 $0 Not Implemented
UD0342 # 04 Y:1991 04 1991 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,611 $2,000 Not Implemented
UD0342 # 05 Y:1991 05 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,474 $11,865 Not Implemented
TN0409 # 01 Y:1990 01 1990 KEEP LAMPS AND REFLECTORS CLEAN $31,973 $43,388 Implemented
TN0409 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $14,470 $1,335 Implemented
TN0409 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,393 $1,230 Implemented
TN0409 # 04 Y:1990 04 1990 CLOSE OFF UNNEEDED STEAM LINES $4,993 $0 Implemented
TN0409 # 05 Y:1990 05 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,480 $1,050 Implemented
TN0409 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,998 $1,000 Implemented
TN0409 # 07 Y:1990 07 1990 INSULATE BARE EQUIPMENT $1,728 $985 Not Implemented
TN0409 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,788 $2,100 Implemented
TN0409 # 09 Y:1990 09 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $138 Implemented
GT0407 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $464 Implemented