IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

586

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0042 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,923 $600 Not Implemented
CO0042 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $283 $200 Implemented
CO0042 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $69 $100 Not Implemented
CO0042 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,926 $200 Implemented
CO0042 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,256 $2,000 Not Implemented
CO0042 # 09 Y:1985 09 1985 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,421 $5,500 Not Implemented
CO0042 # 10 Y:1985 10 1985 COVER OPEN TANKS $1,052 $234 Not Implemented
CO0042 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $18,823 $500 Implemented
CO0042 # 12 Y:1985 12 1985 INSTALL STORM WINDOWS AND DOORS $7,925 $4,000 Not Implemented
CO0042 # 13 Y:1985 13 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,837 $5,000 Not Implemented
CO0042 # 14 Y:1985 14 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $1,459 Implemented
AT0005 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $490 $1,183 Implemented
AT0005 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,390 $300 Implemented
AT0005 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $291 $400 Implemented
AT0005 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,384 $226 Implemented
AT0005 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $346 $0 Not Implemented
AT0005 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $24,347 $1,200 Implemented
OK0153 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $75 Implemented
OK0153 # 02 Y:1985 02 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $580 $300 Not Implemented
OK0153 # 03 Y:1985 03 1985 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $104 $259 Not Implemented
OK0153 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $282 $130 Not Implemented
OK0153 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,170 $7,500 Not Implemented
OK0122 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,546 $346 Not Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented