IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0379 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $1,566 Not Implemented
SF0379 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,329 $0 Implemented
SF0379 # 02 Y:2009 02 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $909 $0 Implemented
SF0379 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $8,945 $5,833 Implemented
SF0379 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,419 $28,144 Implemented
SF0379 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $3,347 $4,920 Implemented
SF0379 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $1,288 Implemented
UM0357 # 07 Y:2009 07 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,875 $7,500 Implemented
UM0357 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,523 $1,359 Implemented
UM0357 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $1,466 $4,692 Implemented
UM0357 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,053 $42,818 Implemented
UM0357 # 02 Y:2009 02 2009 USE RADIANT HEATER FOR SPOT HEATING $48,733 $25,000 Implemented
UM0357 # 01 Y:2009 01 2009 INSTALL STORM WINDOWS AND DOORS $88,261 $361,980 Implemented
UM0357 # 04 Y:2009 04 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,524 $2,591 Implemented
AM0562 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $52 Not Implemented
AM0562 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $53 Not Implemented
AM0562 # 05 Y:2009 05 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $500 $2,275 Implemented
AM0562 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $685 $120 Not Implemented
AM0562 # 03 Y:2009 03 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $685 $120 Not Implemented
AM0562 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,050 $2,000 Implemented
AM0562 # 01 Y:2009 01 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,000 $33,800 Implemented
SD0418 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $198 $0 Not Implemented
SD0418 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,671 $500 Not Implemented
SD0418 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,141 $4,207 Not Implemented
SD0418 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $205 $246 Implemented