IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0003 # 08 Y:1991 08 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,990 $600 Not Implemented
SD0003 # 07 Y:1991 07 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,494 $0 Not Implemented
SD0003 # 06 Y:1991 06 1991 KEEP LAMPS AND REFLECTORS CLEAN $2,030 $5,280 Not Implemented
SD0003 # 05 Y:1991 05 1991 KEEP LAMPS AND REFLECTORS CLEAN $4,131 $9,652 Not Implemented
SD0003 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $4,991 $10,350 Not Implemented
SD0003 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $102 $80 Not Implemented
SD0003 # 01 Y:1991 01 1991 COVER OPEN TANKS $1,090 $256 Not Implemented
SD0003 # 02 Y:1991 02 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,229 $1,500 Not Implemented
RU0110 # 02 Y:1991 02 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,910 $1,133 Implemented
RU0110 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $162 Implemented
RU0110 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,009 $500 Implemented
RU0110 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $693 $0 Implemented
RU0110 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,640 $5,700 Implemented
RU0110 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,407 $0 Implemented
RU0110 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $527 $0 Implemented
WI0110 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,416 $3,500 Implemented
WI0110 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $546 Implemented
WI0110 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $282 $500 Implemented
WI0110 # 04 Y:1991 04 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,840 $9,000 Implemented
WI0110 # 05 Y:1991 05 1991 INSTALL STORM WINDOWS AND DOORS $1,141 $6,311 Implemented
WI0110 # 06 Y:1991 06 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,062 $2,214 Implemented
WI0110 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $346 $800 Implemented