Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
685
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0215 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $211 | $0 | Implemented |
AT0054 # 01 Y:1986 | 01 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $820 | $986 | Implemented |
AT0054 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $4,453 | $0 | Implemented |
AT0054 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $0 | Implemented |
AT0054 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,066 | $150 | Implemented |
AT0054 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,521 | $0 | Implemented |
AT0054 # 06 Y:1986 | 06 | 1986 | COVER OPEN TANKS | $7,949 | $1,850 | Implemented |
AT0054 # 07 Y:1986 | 07 | 1986 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $644 | $500 | Implemented |
AT0054 # 08 Y:1986 | 08 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $122 | $150 | Implemented |
AT0054 # 09 Y:1986 | 09 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,814 | $1,500 | Implemented |
ST0068 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,163 | $300 | Implemented |
ST0068 # 02 Y:1986 | 02 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $246 | $0 | Implemented |
ST0068 # 03 Y:1986 | 03 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $264 | $1,000 | Implemented |
ST0068 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,224 | $1,700 | Implemented |
ST0068 # 07 Y:1986 | 07 | 1986 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $112,028 | $82,000 | Implemented |
ST0044 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $967 | $0 | Implemented |
ST0044 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $231 | $0 | Implemented |
TN0248 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,966 | $375 | Implemented |
TN0248 # 02 Y:1985 | 02 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,354 | $4,000 | Implemented |
TN0248 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $1,628 | $800 | Implemented |
TN0248 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $1,044 | $750 | Implemented |
TN0248 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $967 | $0 | Implemented |
TN0248 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $500 | Implemented |
ST0004 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $599 | $537 | Implemented |
ST0004 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,185 | $200 | Implemented |