IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0068 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $264 $1,000 Implemented
ST0068 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,224 $1,700 Implemented
ST0068 # 07 Y:1986 07 1986 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $112,028 $82,000 Implemented
ST0044 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $967 $0 Implemented
ST0044 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $231 $0 Implemented
TN0248 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,966 $375 Implemented
TN0248 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,354 $4,000 Implemented
TN0248 # 03 Y:1985 03 1985 COVER OPEN TANKS $1,628 $800 Implemented
TN0248 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,044 $750 Implemented
TN0248 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $0 Implemented
TN0248 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $500 Implemented
ST0004 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $537 Implemented
ST0004 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,185 $200 Implemented
ST0004 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,058 $40 Implemented
ST0004 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $583 $1,480 Implemented
ST0004 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $990 $960 Implemented
ST0004 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,135 $845 Implemented
KU0142 # 01 Y:1984 01 1984 AIR CONDITION ONLY SPACE NECESSARY $94,910 $8,142 Implemented
KU0142 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $43,246 $0 Implemented
KU0142 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,724 $0 Implemented
KU0142 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,695 $2,171 Implemented
KU0142 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $12,405 $9,000 Implemented
KU0142 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,842 $5,000 Implemented
KU0142 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $1,500 Implemented
KU0142 # 13 Y:1984 13 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,360 $3,500 Implemented