IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0201 # 02 Y:2024 02 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,654 $0 n/a
IP0201 # 03 Y:2024 03 2024 INSTALL SUB-METERING EQUIPMENT $3,904 $700 n/a
IP0201 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $133,638 $39,257 n/a
IP0201 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $4,991 $1,471 n/a
IP0201 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $2,678 $1,198 n/a
IP0201 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,237 $2,101 n/a
IP0201 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,830 $25,000 n/a
IP0201 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $55,084 $0 n/a
ND0207 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $2,015 Not Implemented
ND0207 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,073 $2,208 Implemented
ND0207 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $20,500 $19,000 Implemented
ND0207 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74 $275 Implemented
ND0167 # 01 Y:1993 01 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,917 $1,821 n/a
ND0167 # 10 Y:1993 10 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $100 $382 n/a
ND0167 # 09 Y:1993 09 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $221 $553 n/a
ND0167 # 08 Y:1993 08 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $260 $0 n/a
ND0167 # 07 Y:1993 07 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $415 $800 n/a
ND0167 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $539 $1,000 n/a
ND0167 # 05 Y:1993 05 1993 PAY UTILITY BILLS ON TIME $1,136 $0 n/a
ND0167 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,118 $225 n/a
ND0167 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $656 $1,220 n/a
ND0167 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,686 $200 n/a
ND0026 # 10 Y:1992 10 1992 INSTALL STORM WINDOWS AND DOORS $574 $2,010 Not Implemented
ND0026 # 09 Y:1992 09 1992 INSTALL STORM WINDOWS AND DOORS $1,647 $3,713 Not Implemented
ND0026 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $638 Implemented