IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0133 # 03 Y:1994 03 1994 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $5,276 $7,200 Not Implemented
BD0009 # 01 Y:1994 01 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,608 $12,904 Not Implemented
BD0009 # 02 Y:1994 02 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,553 $5,412 Not Implemented
BD0009 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,666 $1,430 Implemented
BD0009 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $226 $100 Implemented
BD0009 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,608 $1,500 Not Implemented
UD0428 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,291 $75,000 Implemented
UD0428 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,373 $2,400 Implemented
UD0428 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,231 $46,256 Implemented
UD0428 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,185 $57,200 Not Implemented
NC0022 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,088 $90 Implemented
NC0022 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $309 $10 Implemented
NC0022 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,432 $1,592 Implemented
NC0022 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,119 $9,280 Not Implemented
NC0022 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $500 Not Implemented
AM0209 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,000 $27,760 Not Implemented
AM0209 # 02 Y:1994 02 1994 ADJUST BURNERS FOR EFFICIENT OPERATION $1,890 $540 Implemented
AM0209 # 03 Y:1994 03 1994 INSTALL SKYLIGHTS $955 $1,300 Implemented
AM0209 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $437 $280 Implemented
AM0207 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,600 $0 n/a
AM0207 # 02 Y:1994 02 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,090 $600 n/a
AM0207 # 03 Y:1994 03 1994 CHECK FOR ACCURACY OF UTILITY / POWER METERS $6,600 $700 n/a
AM0207 # 04 Y:1994 04 1994 PAY UTILITY BILLS ON TIME $5,400 $0 n/a
AM0207 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,990 $4,300 n/a
AM0207 # 06 Y:1994 06 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,150 $0 n/a