IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0150 # 04 Y:1992 04 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,123 $44,000 Not Implemented
RU0150 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $517 $30 Not Implemented
RU0150 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,376 $500 Not Implemented
RU0150 # 07 Y:1992 07 1992 OPTIMIZE PLANT POWER FACTOR $5,770 $0 Not Implemented
RU0150 # 08 Y:1992 08 1992 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $123,105 $327,000 Not Implemented
CO0241 # 01 Y:1992 01 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,250 $5 Implemented
CO0241 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,920 $3,500 Implemented
CO0241 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $200 Implemented
CO0241 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $110 Implemented
CO0241 # 05 Y:1992 05 1992 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $460 $250 Implemented
CO0241 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $340 $450 Implemented
CO0241 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $240 $1,110 Implemented
MO0054 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,284 $0 Not Implemented
MO0054 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,034 $1,600 Not Implemented
MO0054 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $851 $1,522 Not Implemented
MO0054 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,364 $0 Not Implemented
MO0054 # 05 Y:1992 05 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,028 $20 Not Implemented
MO0054 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $438 Not Implemented
MO0054 # 07 Y:1992 07 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $192 $620 Implemented
MO0054 # 08 Y:1992 08 1992 RECOVER AND REUSE COOLING WATER $8,137 $12,000 Not Implemented
WI0142 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,830 $314 Implemented
WI0142 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,233 $800 Implemented
WI0142 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $244 Implemented
WI0142 # 04 Y:1992 04 1992 IMPROVE LUBRICATION PRACTICES $1,215 $0 Not Implemented
WI0142 # 05 Y:1992 05 1992 COVER OPEN TANKS $967 $500 Not Implemented