Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0249 # 03 Y:1985 | 03 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $218 | $585 | Not Implemented |
GT0249 # 04 Y:1985 | 04 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $277 | $150 | Implemented |
PV0002 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $375 | $79 | Not Implemented |
PV0002 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,792 | $10 | Not Implemented |
PV0002 # 03 Y:1985 | 03 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,393 | $0 | Not Implemented |
ST0011 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,259 | $0 | Implemented |
ST0011 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $148 | $537 | Not Implemented |
ST0011 # 03 Y:1984 | 03 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,083 | $190 | Implemented |
ST0011 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $2,290 | Implemented |
ST0011 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
ST0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $93 | $45 | Implemented |
ST0011 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,210 | $56 | Implemented |
ST0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $435 | Implemented |
ST0011 # 09 Y:1984 | 09 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $668 | $500 | Implemented |
TS0011 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,244 | $500 | Not Implemented |
TS0011 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $246 | $0 | Not Implemented |
TS0011 # 03 Y:1984 | 03 | 1984 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,415 | $0 | Not Implemented |
TS0011 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $677 | $2,376 | Not Implemented |
TS0011 # 05 Y:1984 | 05 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $217 | $0 | Not Implemented |
TS0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $242 | $500 | Not Implemented |
TS0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $800 | Not Implemented |
LT0008 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $380 | $300 | Implemented |
LT0008 # 02 Y:1984 | 02 | 1984 | COVER OPEN TANKS | $134 | $204 | Not Implemented |
LT0008 # 03 Y:1984 | 03 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $375 | Implemented |
KU0135 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,770 | $17,000 | Not Implemented |