IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0024 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,181 $32,800 Implemented
MZ0024 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $900 Implemented
MZ0024 # 05 Y:2008 05 2008 USE OPTIMUM THICKNESS INSULATION $430 $800 Not Implemented
MZ0024 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,506 $5,600 Not Implemented
MZ0024 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $828 $370 Not Implemented
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0550 # 05 Y:2000 05 2000 $40,768 $5,000 Not Implemented
KU0550 # 04 Y:2000 04 2000 $101,920 $34,000 Not Implemented
KU0550 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $20 Not Implemented
KU0550 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $650 Not Implemented
KU0529 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $930 Implemented
KU0529 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $700 Implemented
KU0529 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,840 $840 Implemented
KU0529 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $660 $190 Not Implemented
MO0048 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $677 $755 Not Implemented
MO0048 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,646 $0 Not Implemented
MO0048 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,770 $40 Not Implemented
MO0048 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,183 $292 Implemented
MO0048 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $507 Not Implemented
MO0048 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $283 Not Implemented
KU0185 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,660 $10,929 Implemented
KU0185 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $447 $310 Not Implemented
KU0185 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $80 Implemented
KU0185 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $315 $60 Implemented
KU0185 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,145 $1,380 Implemented