Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3496 | Misc. Fabricated Wire Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0024 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM THICKNESS INSULATION | $430 | $800 | Not Implemented |
MZ0024 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,506 | $5,600 | Not Implemented |
MZ0024 # 03 Y:2008 | 03 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $828 | $370 | Not Implemented |
MZ0024 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,181 | $32,800 | Implemented |
MZ0024 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $900 | Implemented |
KU0550 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $650 | Not Implemented |
KU0550 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,768 | $5,000 | Not Implemented |
KU0550 # 04 Y:2000 | 04 | 2000 | AUTOMATE FINISHING PROCESS | $101,920 | $34,000 | Not Implemented |
KU0550 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,038 | $20 | Not Implemented |
KU0550 # 01 Y:2000 | 01 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,989 | $17,000 | Not Implemented |
KU0529 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $700 | Implemented |
KU0529 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,840 | $840 | Implemented |
KU0529 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $660 | $190 | Not Implemented |
KU0529 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $600 | $930 | Implemented |
MO0048 # 02 Y:1992 | 02 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,646 | $0 | Not Implemented |
MO0048 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $890 | $283 | Not Implemented |
MO0048 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $313 | $507 | Not Implemented |
MO0048 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,183 | $292 | Implemented |
MO0048 # 03 Y:1992 | 03 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $40 | Not Implemented |
MO0048 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $677 | $755 | Not Implemented |
KU0185 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $315 | $0 | Implemented |
KU0185 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105 | $0 | Implemented |
KU0185 # 09 Y:1986 | 09 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $100 | $0 | Implemented |
KU0185 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,660 | $10,929 | Implemented |
KU0185 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $447 | $310 | Not Implemented |