IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0042 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,200 $1,760 Implemented
DL0042 # 04 Y:2009 04 2009 ADD AREA LIGHTING SWITCHES $11,009 $1,325 Not Implemented
DL0042 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,332 $368 Not Implemented
DL0042 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $500 Not Implemented
DL0042 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,600 $36,600 Not Implemented
DL0042 # 09 Y:2009 09 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $469 $4,845 Not Implemented
DL0042 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,400 $41,000 Not Implemented
LE0150 # 02 Y:2002 02 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,303 $2,400 Implemented
LE0150 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $500 Implemented
LE0150 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $2,256 $1,050 Implemented
LE0138 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $1,551 $60 Implemented
LE0138 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,471 $100 Implemented
LE0138 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $0 Not Implemented
LE0138 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $0 Implemented
LE0138 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $147 Not Implemented
LE0138 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $27,336 $6,800 Not Implemented
LE0138 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $311 $500 Not Implemented
LE0128 # 05 Y:2002 05 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,794 $6,480 Not Implemented
LE0128 # 04 Y:2002 04 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $793 $830 Not Implemented
LE0128 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $1,280 Not Implemented
LE0128 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,470 $0 Not Implemented
LE0128 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,406 $2,500 Not Implemented
HO0072 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $467 $472 Implemented
HO0072 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $419 Not Implemented
HO0072 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $232 $800 Not Implemented