Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,372
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0754 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,871 | $2,675 | Implemented |
OR0754 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,033 | $3,560 | Implemented |
OR0754 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $13,859 | $65,000 | Not Implemented |
OK1073 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,771 | $39,489 | Not Implemented |
OK1073 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,548 | $12,334 | Not Implemented |
OK1073 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,161 | $9,927 | Implemented |
OK1073 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,707 | $1,176 | Implemented |
OK1073 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,129 | $0 | Implemented |
LE0526 # 01 Y:2022 | 01 | 2022 | PAY UTILITY BILLS ON TIME | $671 | $0 | Implemented |
LE0526 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,267 | $1,927 | Implemented |
LE0526 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,461 | $2,205 | Implemented |
LE0526 # 04 Y:2022 | 04 | 2022 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,817 | $1,200 | Not Implemented |
LE0526 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,900 | Implemented |
LE0526 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $3,540 | Implemented |
LE0526 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $1,800 | Not Implemented |
LE0526 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,661 | $48,235 | Implemented |
LE0526 # 09 Y:2022 | 09 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $37,269 | $125,000 | Not Implemented |
WV0623 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,629 | $104,885 | Implemented |
WV0623 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $61,441 | $127,733 | Implemented |
WV0623 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $51,704 | $257,600 | Implemented |
WV0623 # 04 Y:2022 | 04 | 2022 | RECYCLE WHITE WATER | $19,492 | $11,082 | Not Implemented |
WV0623 # 05 Y:2022 | 05 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $19,461 | $91,800 | Not Implemented |
WV0623 # 06 Y:2022 | 06 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,348 | $3,600 | Not Implemented |
WV0623 # 07 Y:2022 | 07 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $12,693 | $51,500 | Not Implemented |
WV0623 # 08 Y:2022 | 08 | 2022 | REDUCE VENTILATION AIR | $8,396 | $19,558 | Not Implemented |