IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0023 # 07 Y:1995 07 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,061 $610 Not Implemented
OK0456 # 01 Y:1995 01 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,279 $960 Implemented
OK0456 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,924 $2,916 Not Implemented
OK0456 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $598 $2,277 Not Implemented
OK0456 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $573 $0 Not Implemented
OK0456 # 05 Y:1995 05 1995 INSTALL SET-BACK TIMERS $8,254 $196 Implemented
OK0456 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,531 $27,426 Implemented
NC0048 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,504 $0 Not Implemented
NC0048 # 02 Y:1995 02 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $112 $100 Not Implemented
NC0048 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $38 Not Implemented
NC0048 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $180 Not Implemented
NC0048 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,762 $1,000 Not Implemented
NC0048 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $2,212 $6,061 Not Implemented
AS0139 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,969 $20,628 Not Implemented
AS0139 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $2,093 $6,583 Not Implemented
AS0139 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,539 $8,245 Implemented
AS0139 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,024 $0 Implemented
AS0139 # 05 Y:1995 05 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,891 $10,900 Implemented
AS0139 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $667 $500 Not Implemented
AS0139 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,123 $260 Implemented
AS0139 # 08 Y:1995 08 1995 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $747 $480 Implemented
MO0139 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $37,079 $35,142 Not Implemented
MO0139 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $23,442 $62,400 Not Implemented
MO0139 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $822 $2,276 Not Implemented
MO0139 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,914 $6,490 Not Implemented