IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0294 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,700 $4,490 Implemented
CO0294 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $2,970 Implemented
CO0294 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $50 Implemented
IA0075 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,332 $1,285 Implemented
IA0075 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $1,013 Implemented
IA0075 # 03 Y:1994 03 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,738 $995 Implemented
IA0075 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,369 $1,000 Not Implemented
IA0075 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $645 $573 Implemented
IA0075 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $744 $3,210 Not Implemented
SD0073 # 01 Y:1994 01 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $348 $20 Implemented
SD0073 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $593 $334 Implemented
SD0073 # 03 Y:1994 03 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,860 $240 Implemented
SD0073 # 04 Y:1994 04 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $147 $75 Implemented
SD0073 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $175 Implemented
SD0073 # 06 Y:1994 06 1994 USE POWER DURING OFF-PEAK PERIODS $1,046 $0 Implemented
AR0016 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,096 $1,300 Implemented
AR0016 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $1,860 Implemented
AR0016 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $585 $200 Implemented
AR0016 # 04 Y:1994 04 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,424 $3,240 Implemented
AR0016 # 05 Y:1994 05 1994 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $7,327 $300 Not Implemented
WI0200 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,116 $500 n/a
WI0200 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,899 $800 n/a
WI0200 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,708 $0 n/a
WI0200 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $303 $740 n/a
WI0200 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,293 $3,675 n/a