IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0095 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $163 $200 Not Implemented
AS0095 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $432 $200 Implemented
AS0095 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $506 Implemented
AS0095 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $614 $161 Not Implemented
AS0095 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $1,003 $603 Implemented
AS0095 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $1,320 Not Implemented
AS0095 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $191 $1,072 Not Implemented
AS0095 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,540 $7,500 Not Implemented
AS0095 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $123 $279 Implemented
AS0095 # 10 Y:1993 10 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $703 $500 Implemented
WI0187 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,534 $750 Implemented
WI0187 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $343 $184 Implemented
WI0187 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $278 $40 Implemented
WI0187 # 04 Y:1993 04 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $200 Not Implemented
WI0187 # 05 Y:1993 05 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,023 $5,000 Not Implemented
WI0187 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $2,800 Not Implemented
WI0187 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $167 $150 Not Implemented
WI0187 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $120 Implemented
WI0187 # 09 Y:1993 09 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $255 $600 Not Implemented
WI0187 # 10 Y:1993 10 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $0 Not Implemented
SF0008 # 01 Y:1993 01 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,604 $8,000 Not Implemented
SF0008 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,907 $4,404 Not Implemented
SF0008 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $525 Not Implemented
WI0185 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,039 $0 Not Implemented
WI0185 # 02 Y:1993 02 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,773 $0 Implemented