IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,260

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0016 # 05 Y:1985 05 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $752 $5,600 Not Implemented
ST0016 # 06 Y:1985 06 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,005 $0 Implemented
ST0016 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,643 $378 Implemented
ST0020 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $532 Implemented
ST0020 # 02 Y:1985 02 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $101 $0 Implemented
ST0020 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $581 $537 Implemented
ST0020 # 04 Y:1985 04 1985 INSTALL AUTOMATIC STACK DAMPER $886 $1,074 Implemented
ST0020 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $1,957 $120 Implemented
ST0020 # 06 Y:1985 06 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,756 $1,900 Implemented
ST0020 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $64 Implemented
ST0020 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,102 $600 Implemented
ST0020 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $723 $278 Implemented
ST0009 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $212 Not Implemented
ST0009 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $537 Implemented
ST0009 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $50 $0 Implemented
ST0009 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
ST0009 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $40 $50 Implemented
ST0009 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32 $28 Not Implemented
ST0009 # 07 Y:1984 07 1984 INSTALL AUTOMATIC STACK DAMPER $251 $60 Not Implemented
ST0009 # 08 Y:1984 08 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,149 $0 Implemented
ST0009 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $679 $130 Not Implemented
ST0009 # 10 Y:1984 10 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $750 Not Implemented
TN0228 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,347 $0 Not Implemented
TN0228 # 02 Y:1984 02 1984 COVER OPEN TANKS $392 $500 Not Implemented
TN0228 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $197 $201 Not Implemented