Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,538
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0015 # 07 Y:1984 | 07 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,240 | $103 | Not Implemented |
CO0015 # 08 Y:1984 | 08 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $293 | $120 | Not Implemented |
CO0015 # 09 Y:1984 | 09 | 1984 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $220 | $100 | Not Implemented |
CO0015 # 10 Y:1984 | 10 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,676 | $5,000 | Implemented |
CO0015 # 11 Y:1984 | 11 | 1984 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $335 | $250 | Implemented |
CO0015 # 12 Y:1984 | 12 | 1984 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $1,237 | $3,000 | Not Implemented |
TN0228 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,347 | $0 | Not Implemented |
TN0228 # 02 Y:1984 | 02 | 1984 | COVER OPEN TANKS | $392 | $500 | Not Implemented |
TN0228 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $197 | $201 | Not Implemented |
TN0228 # 04 Y:1984 | 04 | 1984 | ISOLATE HOT OR COLD EQUIPMENT | $568 | $108 | Implemented |
TN0228 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $456 | $87 | Not Implemented |
ST0009 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,275 | $212 | Not Implemented |
ST0009 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $201 | $537 | Implemented |
ST0009 # 03 Y:1984 | 03 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $50 | $0 | Implemented |
ST0009 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
ST0009 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $40 | $50 | Implemented |
ST0009 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32 | $28 | Not Implemented |
ST0009 # 07 Y:1984 | 07 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $251 | $60 | Not Implemented |
ST0009 # 08 Y:1984 | 08 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,149 | $0 | Implemented |
ST0009 # 09 Y:1984 | 09 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $679 | $130 | Not Implemented |
ST0009 # 10 Y:1984 | 10 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $370 | $750 | Not Implemented |
LT0012 # 01 Y:1984 | 01 | 1984 | COVER OPEN TANKS | $2,600 | $691 | Not Implemented |
LT0012 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $2,100 | $2,958 | Implemented |
LT0012 # 03 Y:1984 | 03 | 1984 | COVER OPEN TANKS | $142 | $36 | Not Implemented |
LT0012 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $102 | $160 | Implemented |