Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,238
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0065 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,496 | $1,000 | Not Implemented |
UD0068 # 01 Y:1982 | 01 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $21,549 | $19,000 | Not Implemented |
UD0068 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $931 | $406 | Not Implemented |
UD0068 # 03 Y:1982 | 03 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $99 | $0 | Not Implemented |
UD0064 # 01 Y:1982 | 01 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,885 | $11,043 | Implemented |
UD0064 # 02 Y:1982 | 02 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,605 | $8,000 | Not Implemented |
UD0064 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,486 | $2,126 | Implemented |
UD0064 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,281 | $2,200 | Implemented |
UD0064 # 05 Y:1982 | 05 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $240 | $120 | Not Implemented |
UD0067 # 01 Y:1982 | 01 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,431 | $250 | Implemented |
UD0067 # 02 Y:1982 | 02 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $12,896 | $64,600 | Implemented |
UD0067 # 03 Y:1982 | 03 | 1982 | INSTALL STORM WINDOWS AND DOORS | $6,999 | $7,642 | Implemented |
UD0067 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,770 | $0 | Implemented |
UD0067 # 05 Y:1982 | 05 | 1982 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,207 | $286 | Implemented |
TN0160 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,925 | $625 | Not Implemented |
TN0160 # 02 Y:1982 | 02 | 1982 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $2,734 | $2,210 | Not Implemented |
TN0160 # 03 Y:1982 | 03 | 1982 | INSULATE BARE EQUIPMENT | $1,590 | $150 | Not Implemented |
UD0061 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,961 | $9,877 | Not Implemented |
UD0061 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $72 | $0 | Implemented |
UD0061 # 03 Y:1982 | 03 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $820 | $270 | Not Implemented |
UD0061 # 04 Y:1982 | 04 | 1982 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $177 | $500 | Not Implemented |
UD0063 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,852 | $63,993 | Not Implemented |
UD0063 # 02 Y:1982 | 02 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,588 | $2,222 | Not Implemented |
UD0063 # 03 Y:1982 | 03 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,592 | $61 | Implemented |
UD0063 # 04 Y:1982 | 04 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $29,194 | $42,215 | Implemented |