Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15
matching recommendationsSIC | 3549 | Metalworking Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0015 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $963 | $908 | Implemented |
CO0015 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $300 | $300 | Implemented |
CO0015 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $50 | Implemented |
CO0015 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $694 | $1,127 | Implemented |
CO0015 # 05 Y:1984 | 05 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $5,808 | $4,000 | Not Implemented |
CO0015 # 06 Y:1984 | 06 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $791 | $230 | Implemented |
CO0015 # 07 Y:1984 | 07 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,240 | $103 | Not Implemented |
CO0015 # 08 Y:1984 | 08 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $293 | $120 | Not Implemented |
CO0015 # 09 Y:1984 | 09 | 1984 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $220 | $100 | Not Implemented |
CO0015 # 10 Y:1984 | 10 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,676 | $5,000 | Implemented |
CO0015 # 11 Y:1984 | 11 | 1984 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $335 | $250 | Implemented |
CO0015 # 12 Y:1984 | 12 | 1984 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $1,237 | $3,000 | Not Implemented |
TN0211 # 01 Y:1984 | 01 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $890 | $0 | Not Implemented |
TN0211 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,051 | $0 | Implemented |
TN0211 # 03 Y:1984 | 03 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,366 | $2,753 | Implemented |