IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0985 # 09 Y:2024 09 2024 OPTIMIZE PLANT POWER FACTOR $563 $3,003 n/a
GT0985 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,752 $438,980 n/a
GT0985 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $5,863 n/a
GT0985 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $111 $200 n/a
GT0985 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,117 $1,850 n/a
GT0985 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $3,635 $4,650 n/a
GT0985 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $182 $200 n/a
GT0985 # 02 Y:2024 02 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $164 $90 n/a
GT0985 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $33,932 $2,100 n/a
GT0775 # 01 Y:2004 01 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,720 $1,559 Implemented
GT0775 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $674 $9,444 Implemented
GT0775 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $793 $504 Implemented
GT0775 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,211 $3,232 Implemented
GT0775 # 07 Y:2004 07 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,945 $642 Not Implemented
GT0775 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $980 Implemented
GT0775 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $1,559 Not Implemented
GT0775 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $850 Implemented
GT0775 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $535 $655 Not Implemented
GT0560 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,520 $4,860 Implemented
GT0560 # 02 Y:1995 02 1995 DISCONNECT BALLASTS $1,240 $0 Implemented
GT0560 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $50 Implemented
GT0560 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $680 $1,000 Not Implemented
GT0560 # 05 Y:1995 05 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,030 $5,000 Implemented
GT0365 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $202 $0 Implemented
GT0365 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,041 $800 Implemented