IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0197 # 04 Y:1983 04 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,026 $0 Implemented
GT0197 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,601 $6,500 Not Implemented
GT0197 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,971 $10,500 Implemented
GT0197 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,950 $37,900 Not Implemented
GT0190 # 01 Y:1983 01 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,525 $29,000 Not Implemented
GT0190 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,244 $94,000 Not Implemented
GT0190 # 03 Y:1983 03 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,468 $9,000 Implemented
GT0190 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,821 $6,500 Not Implemented
GT0190 # 05 Y:1983 05 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,250 $500 Not Implemented
GT0190 # 06 Y:1983 06 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $146 $500 Not Implemented
OK0097 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $146 $99 Implemented
OK0097 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,518 $20,020 Not Implemented
OK0097 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,954 $765 Not Implemented
GT0175 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,860 $1,000 Not Implemented
GT0175 # 05 Y:1983 05 1983 COVER OPEN TANKS $499 $900 Not Implemented
GT0175 # 04 Y:1983 04 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $737 $1,451 Not Implemented
GT0175 # 03 Y:1983 03 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,250 $2,200 Not Implemented
GT0175 # 01 Y:1983 01 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,900 $12,800 Not Implemented
OK0074 # 04 Y:1983 04 1983 REDUCE VENTILATION AIR $2,218 $1,863 Implemented
OK0074 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $6,118 $439 Implemented
OK0074 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,098 $136 Not Implemented
OK0074 # 01 Y:1983 01 1983 REDUCE VENTILATION AIR $1,596 $69 Implemented
KU0071 # 04 Y:1983 04 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,383 $862 Not Implemented
KU0071 # 05 Y:1983 05 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $30 Implemented
KU0071 # 08 Y:1983 08 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $593 $200 Not Implemented