IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0046 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,212 $1,394 Not Implemented
CO0046 # 08 Y:1985 08 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,652 $200 Not Implemented
CO0046 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $150 Not Implemented
CO0046 # 06 Y:1985 06 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $977 $1,000 Not Implemented
CO0046 # 05 Y:1985 05 1985 INSTALL STORM WINDOWS AND DOORS $669 $650 Not Implemented
CO0046 # 01 Y:1985 01 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,907 $6,000 Not Implemented
CO0046 # 02 Y:1985 02 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,101 $4,825 Not Implemented
CO0046 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,126 $29,000 Not Implemented
CO0046 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,962 $2,990 Not Implemented
LT0040 # 02 Y:1985 02 1985 COVER OPEN TANKS $1,600 $216 Not Implemented
LT0040 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,590 $4,500 Not Implemented
LT0040 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,890 $9,540 Not Implemented
LT0040 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,625 $450 Not Implemented
OK0174 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $980 $2,872 Implemented
OK0174 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $5,711 $1,000 Implemented
OK0174 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $358 Implemented
CO0031 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,774 $300 Implemented
OK0174 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,578 $21,250 Implemented
CO0031 # 07 Y:1985 07 1985 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $3,892 $600 Not Implemented
CO0031 # 06 Y:1985 06 1985 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $920 $250 Implemented
CO0031 # 05 Y:1985 05 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,602 $10,000 Not Implemented
CO0031 # 04 Y:1985 04 1985 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,585 $15,000 Not Implemented
CO0031 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,624 $1,200 Not Implemented
CO0031 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,968 $58,000 Not Implemented
OK0165 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $63 Implemented