IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 3565 Packaging Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0742 # 05 Y:2002 05 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $706 $0 Implemented
GT0742 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $248 $475 Implemented
GT0742 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $400 Implemented
GT0742 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,487 $15,062 Implemented
GT0742 # 01 Y:2002 01 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,773 $1,400 Implemented
GT0450 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $753 $300 Not Implemented
GT0450 # 06 Y:1991 06 1991 RECOVER WASTE HEAT FROM EQUIPMENT $641 $500 Not Implemented
GT0450 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 Not Implemented
GT0450 # 04 Y:1991 04 1991 REDUCE EXCESS STEAM BLEEDING $2,230 $0 Not Implemented
GT0450 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $143 Not Implemented
GT0450 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,780 $22,892 Not Implemented
GT0265 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $500 Implemented
GT0265 # 06 Y:1985 06 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,080 $15,000 Not Implemented
GT0265 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $77 $480 Implemented
GT0265 # 04 Y:1985 04 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $965 $8,000 Not Implemented
GT0265 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $257 $300 Not Implemented
GT0265 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $932 $1,249 Implemented