Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,676
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0444 # 04 Y:2025 | 04 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $52,643 | $67,500 | n/a |
MS0444 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,814 | $400 | n/a |
MS0444 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,224 | $613,200 | n/a |
MS0444 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,466 | n/a |
WM0242 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,099 | $0 | n/a |
WM0242 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,282 | $0 | n/a |
WM0242 # 03 Y:2025 | 03 | 2025 | COMBINE UTILITY METERS | $6,989 | $2,000 | n/a |
WM0242 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $9,935 | $0 | n/a |
WM0242 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $658 | $1,200 | n/a |
GT0995 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $432 | $200 | n/a |
GT0995 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,089 | $200 | n/a |
GT0995 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,796 | $500 | n/a |
GT0995 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,769 | $1,850 | n/a |
GT0995 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,545 | $269,534 | n/a |
GT0995 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $469 | $313 | n/a |
GT0995 # 02 Y:2025 | 02 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $385 | $90 | n/a |
GT0995 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $746 | $567 | n/a |
MS0442 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $270,995 | $2,128,000 | n/a |
MS0442 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,035 | $40,500 | n/a |
MS0442 # 03 Y:2024 | 03 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $22,444 | $2,454 | n/a |
MS0442 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $1,878 | $2,514 | n/a |
MI0449 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,646 | $700 | n/a |
MI0449 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $1,980 | n/a |
MI0449 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,976 | $61,998 | n/a |
MI0449 # 07 Y:2024 | 07 | 2024 | METER WASTE WATER | $1,195 | $900 | n/a |