IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,655

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0411 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $888 $364 Not Implemented
UF0411 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $62,348 $20,000 Not Implemented
UF0411 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $1,000 Not Implemented
UF0411 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,144 $426 Implemented
UF0411 # 10 Y:2008 10 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,946 $25,280 Not Implemented
UF0411 # 11 Y:2008 11 2008 MODIFY WORKLOAD $8,002 $0 Not Implemented
UF0411 # 12 Y:2008 12 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,419 $3,400 Not Implemented
UF0411 # 13 Y:2008 13 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,982 $0 Implemented
MS0323 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,680 $26,178 Implemented
MS0323 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,013 $266 Implemented
MS0323 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,739 $3,030 Implemented
MS0323 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $8,771 Implemented
MS0323 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $450 Implemented
LE0265 # 01 Y:2007 01 2007 UTILIZE OUTSIDE CONTRACTING $45,000 $7,800 Implemented
LE0265 # 02 Y:2007 02 2007 INSTALL TIMERS AND/OR THERMOSTATS $10,266 $2,250 Implemented
LE0265 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,608 $860 Implemented
LE0265 # 04 Y:2007 04 2007 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,367 $46 Not Implemented
LE0265 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,558 $0 Implemented
LE0265 # 06 Y:2007 06 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $594 $0 Implemented
LE0265 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $200 Not Implemented
LE0265 # 08 Y:2007 08 2007 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $429 $600 Not Implemented
LE0265 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,557 $58,273 Not Implemented
NC0369 # 01 Y:2007 01 2007 COVER OPEN TANKS $11,745 $2,500 Not Implemented
NC0369 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,750 $13,500 Implemented
NC0369 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,420 $1,500 Implemented