IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0208 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $9,375 $9,500 Not Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 05 Y:2022 05 2022 INSTALL SKYLIGHTS $3,058 $10,560 Not Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
DL0208 # 10 Y:2022 10 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,982 $55,000 Implemented
DL0208 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $33,570 Implemented
DL0208 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,331 $2,230 Implemented
DL0208 # 01 Y:2022 01 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $25,361 $3,000 Not Implemented
DL0208 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $627 $96 Not Implemented
DL0208 # 11 Y:2022 11 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,359 $7,840 Not Implemented
DL0208 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,567 $71 Implemented
DL0208 # 12 Y:2022 12 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $436 $2,500 Implemented
DL0208 # 02 Y:2022 02 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $8,504 $0 Not Implemented
DL0208 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $4,894 $0 Not Implemented
DL0208 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $0 Implemented
DL0208 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $23,194 $11,933 Implemented
WM0177 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,032 $2,040 Implemented
WM0177 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,560 $0 Not Implemented
WM0177 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,014 $0 Implemented
WM0177 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $1,573 $4,352 Not Implemented
WM0177 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,483 $1,650 Not Implemented
WM0177 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,090 $2,850 Implemented
CL2113 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,986 $400 n/a