IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3594 Fluid Power Pumps And Motors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1086 # 01 Y:2024 01 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,814 $0 n/a
UD1086 # 11 Y:2024 11 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,817 $0 n/a
UD1086 # 10 Y:2024 10 2024 OPTIMIZE PLANT POWER FACTOR $7,429 $25,300 n/a
UD1086 # 09 Y:2024 09 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,459 $7,620 n/a
UD1086 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,780 $0 n/a
UD1086 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,965 $1,068 n/a
UD1086 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $561 $0 n/a
UD1086 # 05 Y:2024 05 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,962 $7,238 n/a
UD1086 # 04 Y:2024 04 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,233 $0 n/a
UD1086 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $54 $0 n/a
UD1086 # 02 Y:2024 02 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $573 $0 n/a
UD1061 # 06 Y:2023 06 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,842 $100,000 Not Implemented
UD1061 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $952 Implemented
UD1061 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,383 $8,996 Not Implemented
UD1061 # 03 Y:2023 03 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,796 $340 Not Implemented
UD1061 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,024 $375 Implemented
UD1061 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,507 $1,764 Not Implemented
UD0506 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $11,388 $8,000 Implemented
UD0506 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,316 $41,520 Implemented
UD0506 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,416 $31,170 Implemented
UD0506 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,091 $0 Implemented