IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,693

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0032 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $3,190 $8,820 Not Implemented
IA0032 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $500 Implemented
IA0032 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,142 $100 Not Implemented
IA0032 # 08 Y:1992 08 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $68 $183 Implemented
UF0011 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $0 Not Implemented
UF0011 # 02 Y:1991 02 1991 KEEP LAMPS AND REFLECTORS CLEAN $11,496 $0 Not Implemented
UF0011 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $230 $326 Not Implemented
UF0011 # 04 Y:1991 04 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,385 $12,375 Not Implemented
UF0011 # 05 Y:1991 05 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,001 $0 Not Implemented
UF0011 # 06 Y:1991 06 1991 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $1,436 $6,000 Not Implemented
GT0432 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,719 $7,993 Not Implemented
GT0432 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $115 $443 Not Implemented
GT0432 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $610 $150 Not Implemented
GT0432 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $265 $1,200 Not Implemented
GT0432 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $1,500 Not Implemented
GT0432 # 06 Y:1991 06 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,770 $2,970 Not Implemented
OK0311 # 01 Y:1990 01 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,239 $2,150 Implemented
OK0311 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,549 $750 Implemented
OK0311 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,942 $1,641 Not Implemented
OK0311 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $578 $190 Implemented
OK0311 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,396 $0 Implemented
OK0311 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,283 $632 Not Implemented
OK0311 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,494 $975 Implemented
AM0094 # 01 Y:1990 01 1990 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $31,894 $22,000 Implemented
AM0094 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $8,700 $450 Implemented