IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0991 # 03 Y:2018 03 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,813 $0 Not Implemented
OK0991 # 04 Y:2018 04 2018 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,577 $1,015 Implemented
OK0991 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $536 Implemented
OK0991 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $724 $0 Implemented
LE0464 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $214 $40 Implemented
LE0464 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $114 $40 Implemented
LE0464 # 03 Y:2018 03 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,836 $28,000 Implemented
LE0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,809 $23,000 Implemented
LE0464 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,187 $12,000 Implemented
IP0109 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,423 $0 Implemented
IP0109 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $59 Implemented
IP0109 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,901 $2,251 Not Implemented
IP0109 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,301 $51,647 Implemented
IP0109 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,506 $1,246 Not Implemented
IP0109 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,342 $5,885 Implemented
IP0109 # 07 Y:2018 07 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,448 $205,000 Not Implemented
SF0528 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,402 $11,547 Not Implemented
SF0528 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $22,874 Implemented
SF0528 # 03 Y:2018 03 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,178 $27,403 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented
GT0916 # 03 Y:2018 03 2018 USE OPTIMUM TEMPERATURE $29,211 $1,600 Not Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented