Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
739
matching recommendationsSIC | 361 | Electric Distribution Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0159 # 02 Y:2022 | 02 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $693 | $0 | Implemented |
IP0159 # 01 Y:2022 | 01 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,135 | $0 | Implemented |
WV0621 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $12,269 | $21,859 | Implemented |
WV0621 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,862 | $48,343 | Not Implemented |
WV0621 # 03 Y:2022 | 03 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,354 | $20,540 | Not Implemented |
WV0621 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,686 | $23,557 | Not Implemented |
WV0621 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,366 | $465 | Implemented |
WV0621 # 06 Y:2022 | 06 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,888 | $18,000 | Not Implemented |
WV0621 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,302 | $2,408 | Implemented |
WV0621 # 08 Y:2022 | 08 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,675 | $3,980 | Not Implemented |
WV0621 # 09 Y:2022 | 09 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,010 | $4,122 | Implemented |
WV0621 # 10 Y:2022 | 10 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $601 | $98 | Implemented |
WV0621 # 11 Y:2022 | 11 | 2022 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,747 | Implemented |
WV0621 # 12 Y:2022 | 12 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $1,321 | Not Implemented |
WV0621 # 13 Y:2022 | 13 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $412 | $1,761 | Implemented |
WV0621 # 14 Y:2022 | 14 | 2022 | INSULATE BARE EQUIPMENT | $139 | $325 | Implemented |
TT0227 # 01 Y:2019 | 01 | 2019 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $73,127 | $4,450 | Not Implemented |
TT0227 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,143 | $2,500 | Not Implemented |
TT0227 # 07 Y:2019 | 07 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $399 | $750 | Not Implemented |
TT0227 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,110 | $550 | Not Implemented |
TT0227 # 05 Y:2019 | 05 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,646 | $2,000 | Implemented |
TT0227 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,227 | $2,000 | Implemented |
TT0227 # 03 Y:2019 | 03 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,828 | $5,000 | Implemented |
GT0926 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,597 | $57,656 | Implemented |
GT0926 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,641 | $60,000 | Not Implemented |