IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3613 Switchgear And Switchboard Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0337 # 06 Y:2023 06 2023 IMPROVE SPACE COMFORT CONDITIONING $150,000 $75,650 Implemented
MZ0337 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,882 $6,873 Implemented
MZ0337 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $330 $820 Not Implemented
MZ0337 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $314 $100 Implemented
MZ0337 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,106 $2,400 Implemented
MZ0337 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,895 $9,731 Implemented
MZ0100 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,458 $30,000 Implemented
MZ0100 # 02 Y:2012 02 2012 AIR CONDITION ONLY SPACE NECESSARY $4,220 $4,000 Not Implemented
MZ0100 # 01 Y:2012 01 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $10,313 $2,550 Implemented
MO0131 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $824 Not Implemented
MO0131 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,762 $1,470 Not Implemented
MO0131 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,092 $34,176 Not Implemented
MO0131 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,415 $985 Implemented
MO0131 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,050 $18,455 Implemented
MO0131 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,648 $2,614 Not Implemented
MO0002 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $7,308 $18,163 Not Implemented
MO0002 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $930 Not Implemented
MO0002 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,165 $150 Implemented
MO0002 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $2,183 $5,826 Not Implemented
MO0002 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,186 $100 Implemented
MO0002 # 02 Y:1990 02 1990 USE MINIMUM SAFE OVEN VENTILATION $4,111 $760 Not Implemented